Afghanistan: Hairatan to Mazar-e-Sharif Railway Project

December 24, 2015 | Transport | Validation of Project/Program Completion Report

Afghanistan is a landlocked country facing tough sociopolitical and physical challenges. At the time of project preparation, Hairatan was Afghanistan’s main dry and river port, accounting for close to 50% of its total imports. However, an existing rail line between Termez in Uzbekistan and Hairatan did not have a rail link into Afghanistan. Freight into Afghanistan and beyond had to be off-loaded and reloaded into trucks at Hairatan. This process was costly and slow and limited volume flows. Removing this bottleneck was considered an urgent task.

The extension of the Termez–Hairatan railway link into Mazar-e-Sharif in Afghanistan was a top government priority. This railway line was expected to create a reliable, safe, and sustainable transport link between Afghanistan and its neighboring countries to increase regional cooperation and trade. It was also considered key to expanding job creation, investment, and ultimately poverty reduction in Afghanistan.

This report validates the completion report’s assessment of the project. IED overall assessment: Less than successful.

view lessons »


Addendum to the Afghanistan Power Sector Master Plan: Technical Assistance Completion Report

July 1, 2015 | Energy | Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated July 2015 is provided for the ADB project 43497-013 in Afghanistan.

view lessons »


Security Plan for Project Implementation: Techincal Assistance Completion Report

July 1, 2015 | Public Sector Management | Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated July 2015 is provided for the ADB project 42089-012 in Afghanistan.

view lessons »


Afghanistan and Tajikistan: Regional Power Transmission Interconnection Project

November 25, 2014 | Energy | Validation of Project/Program Completion Report

This report validates the completion report’s assessment of the project, which aimed to enhance regional cooperation in the power sector through transmission interconnectivity. IED overall assessment: Successful.

view lessons »


Regional Power Transmission Interconnection Project (Afghanistan and Tajikistan)

June 1, 2014 | Energy | Project/Program Completion Reports (PCR)

Project or program completion reports evaluate design, implementation and performance of a project or program, and provide an overall assessment and recommendations.

This document dated June 2014 is provided for the ADB project 40043-013.

view lessons »


Afghanistan: Private Sector and Financial Market Development Program

May 6, 2014 | Finance | Validation of Project/Program Completion Report

view lessons »


Afghanistan: Fiscal Management and Public Administration Reform Program

December 28, 2013 | Public Sector Management | Validation of Project/Program Completion Report

view lessons »


North-South Corridor Project

February 9, 2013 | Health, Transport | Project/Program Completion Reports (PCR)

Project or program completion reports evaluate design, implementation and performance of a project or program, and provide an overall assessment and recommendations.

This document dated September 2013 is provided for the ADB project 39467-013 in Afghanistan.

view lessons »


Hairatan to Mazar-e-Sharif Railway Project

January 6, 2013 | Transport | Project/Program Completion Reports (PCR)

Project or program completion reports evaluate design, implementation and performance of a project or program, and provide an overall assessment and recommendations.

This document dated June 2013 is provided for the ADB project 42533-022 in Afghanistan.

view lessons »


Afghanistan: Andkhoy – Qaisar Road Project

December 27, 2012 | Transport | Validation of Project/Program Completion Report

Validates the completion report’s assessment of the project, which aimed to support government efforts to reestablish the primary road network damaged during two decades of conflict and neglect. IED overall assessment: Successful

view lessons »


Download all Lessons for Afghanistan

Download Excel File