Select Page

Nam Ngum River Basin Development Sector Project: Project Completion Report

Project or program completion reports evaluate design, implementation and performance of a project or program, and provide an overall assessment and recommendations.

This document dated June 2016 is provided for the ADB project 33356-014, 33356-013 in the Lao People’s Democratic Republic.

Indonesia: Participatory Irrigation Sector Project

The Participatory Irrigation Sector Project in Indonesia was approved on 19 December 2003 with an estimated cost of $126.0 million equivalent. The project was financed by two loans to a value of $73.0 million from the Asian Development Bank and a $15.0 million grant from the Government of the Netherlands. The project had four outputs: (i) upgraded district capacity to manage irrigation responsibilities, (ii) improved irrigation performance at scheme level, (iii) improved extension services and farmer access to agricultural inputs and services, and (iv) an improved system for water resource management information and asset management.

People’s Republic of China: Sanjiang Plain Wetlands Protection Project

The Sanjiang Plain wetlands, located in the northeastern Heilongjiang Province, comprise one of the richest areas of globally significant biodiversity in the People’s Republic of China (PRC) but also one of the country’s most important food production regions. The area of the wetlands has been reduced by 80% from its original size since the 1950s due to multiple pressures, most notably drainage to reclaim land for farming. In support of these challenges and at the request of the PRC, an Asian Development Bank (ADB) loan for $15 million was cofinanced by a Global Environment Facility grant of $12.14 million that was administered by ADB.

Provision of Environment Technical Services: Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated September 2015 is provided for the ADB regional project 45384-001.

Managing the Water Resources of Boyang Lake: Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated August 2015 is provided for the ADB project 45062-001 in the People’s Republic of China.

Pilot Implementation of the Drought Management Strategy: Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated June 2015 is provided for the ADB project 46085-001 in the People’s Republic of China.

Study on Eco-Compensation Regulations: Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions.

This document dated June 2015 is provided for the ADB project 44501-001 in the People’s Republic of China.