Select Page

State-Owned Enterprise Rationalization Program: TA Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated March 2015 is provided for the ADB project 43413-012 in Vanuatu.

HIV/AIDS Prevention and Capacity Development in the Pacific

Project or program completion reports evaluate design, implementation and performance of a project or program, and provide an overall assessment and recommendations.

This document dated December 2011 is provided for the ADB project 38599-022.

Urban Infrastructure Project

Project or program completion reports evaluate design, implementation and performance of a project or program, and provide an overall assessment and recommendations.

This document dated June 2003 is provided for the ADB project LN1448 in Vanuatu.

Comprehensive Reform Program

Project or program completion reports evaluate design, implementation and performance of a project or program, and provide an overall assessment and recommendations.

This document dated December 2002 is provided for the ADB project 31485-013 in Vanuatu.

Santo Port Project (Loans 843/1080-VAN[SF])

This report evaluates the performance of the Santo Port Project aimed at maintaining exports and imports by providing Santo Port in Vanuatu with a new earthquake-resistant wharf for overseas ships after the existing wharf severely deteriorated. IED overall assessment: Partly successful.

Multiproject Loan (Loan 766-VAN[SF])

This report evaluates the performance of the Multiproject Loan Project designed to improve transport facilities for the collection and export of copra and reconstruction and upgrade of school buildings destroyed by cyclones in Vanuatu.