Latest Reports

GMS – Cambodia Northwest Provincial Road Improvement Project: Project Completion Report

July 1, 2016 | Cambodia | Project/Program Completion Reports (PCR)

Project or program completion reports evaluate design, implementation and performance of a project or program, and provide an overall assessment and recommendations.

This document dated July 2016 is provided for the ADB project 42358-013 in Cambodia.

view lessons »


Northern Power Transmission Expansion Sector Project: Project Completion Report

June 1, 2016 | Viet Nam | Project/Program Completion Reports (PCR)

Project or program completion reports evaluate design, implementation and performance of a project or program, and provide an overall assessment and recommendations.

This document dated June 2016 is provided for the ADB project 38196-013 in Viet Nam.

view lessons »


CAREC Midterm Review of the Transport and Trade Facilitation Strategy and Implementation Action Plan: Technical Assistance Completion Report

May 1, 2016 | Regional | Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions.

This document dated May 2016 is provided for the ADB regional project 46263-001.

view lessons »


Development Partnership Program for South Asia: Technical Assistance Completion Report

May 1, 2016 | Regional | Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated May 2016 is provided for the ADB regional project 40124-012.

view lessons »


Technology Transfer for Disaster Resilient Infrastructure Project Development: Technical Assistance Completion Report

May 1, 2016 | Regional | Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated May 2016 is provided for the ADB regional project 48481-001.

view lessons »


Central Asia Regional Economic Cooperation Institute, 2009-2012: Technical Assistance Completion Report

January 1, 2016 | Regional | Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated January 2016 is provided for the ADB regional project 42111-012.

view lessons »


Afghanistan: Hairatan to Mazar-e-Sharif Railway Project

December 24, 2015 | Afghanistan | Validation of Project/Program Completion Report

Afghanistan is a landlocked country facing tough sociopolitical and physical challenges. At the time of project preparation, Hairatan was Afghanistan’s main dry and river port, accounting for close to 50% of its total imports. However, an existing rail line between Termez in Uzbekistan and Hairatan did not have a rail link into Afghanistan. Freight into Afghanistan and beyond had to be off-loaded and reloaded into trucks at Hairatan. This process was costly and slow and limited volume flows. Removing this bottleneck was considered an urgent task.

The extension of the Termez–Hairatan railway link into Mazar-e-Sharif in Afghanistan was a top government priority. This railway line was expected to create a reliable, safe, and sustainable transport link between Afghanistan and its neighboring countries to increase regional cooperation and trade. It was also considered key to expanding job creation, investment, and ultimately poverty reduction in Afghanistan.

This report validates the completion report’s assessment of the project. IED overall assessment: Less than successful.

view lessons »


Promoting Regional Infrastructure Development: Technical Assistance Completion Report

December 1, 2015 | Regional | Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated December 2015 is provided for the ADB regional project 44147-012.

view lessons »


Sustainable Fuel Partnership Study – Exploring an Innovative Market Scheme to Advance Sustainable Transport and Fuel Security: Technical Assistance Completion Report

November 1, 2015 | Regional | Technical Assistance Completion Report

Technical assistance completion reports describe for technical assistance projects the expected impact, outcome and outputs; conduct of activities; evaluation and achievement of the expected outcomes; an assessment and rating; major lessons; and recommendations and follow-up actions. This document dated November 2015 is provided for the ADB regional project 41270-012.

view lessons »


Northern Greater Mekong Subregion Transport Network Improvement Project: Completion Report

October 31, 2015 | Lao PDR | Project/Program Completion Reports (PCR)

This report evaluates the design, implementation and performance of said project in Lao People’s Democratic Republic, and provides an overall assessment and recommendations.

view lessons »


Regional Integration

RCI aims at poverty reduction through collaboration and greater physical connectivity, expansion of trade and investment, development of financial system and macroeconomic and financial stability and improved environmental, health and social conditions.

Regional projects require collective effort and actions of two or more, not necessarily adjacent countries, to

(i) produce goods and services that benefit the participating countries;
(ii) jointly respond to cross-border issues, such as environmental degradation, international crime, communicable diseases, natural disasters, or regional economic crises;
(iii) develop national projects with significant regional dimensions or implications, such as a country transport system that is part of a regional transport system, a national power grid within a regional power grid, a national gas pipeline that is part of a network of regional gas pipelines, and associated agreements and protocols that allow an efficient flow of goods, services and people, harmonization of standards and
regulations, or cost-effective communication across region’s countries;
(iv) support to research and knowledge related to subthemes (four pillars of the RCI strategy); and
(v) promote knowledge sharing and dissemination among the participating countries.

  • Cross-border infrastructure
  • Trade and investments
  • Money and finance
  • Other regional public goods